Skip to main content

Executive Dashboard

Real-time manufacturing overview
Shift A — 06:00-14:00
RB

Factory Pulse

Live status across all production lines

Machine Status

Running
0
Idle
0
Down
0

Current Shift OEE

84% Target: 85%

Active Downtimes

0
Line D
47 min
Bearing replacement
Line A
12 min
Changeover

Department Health

Key metrics by department

Production

OEE
84%
Output
284K
Scrap
2.1%

Quality

FPY
97.3%
Open NCRs
12
CAPAs
4

Inventory

Accuracy
96.2%
Low Stock
7
Turns
6.7x

Maintenance

PM Compliance
91%
Open WOs
23
MTTR
2.4h

Safety

Days LTI-Free
142
Near Misses
3
Open Actions
5

Finance

Budget Used
68%
Cost/Unit
R12.40
Overdue Inv.
9

Alerts & Exceptions

Items requiring immediate attention
Line D bearing failure — unplanned downtime
Maintenance dispatched, ETA 25 min. Spare bearing confirmed in warehouse.
14 min ago Critical
NCR-2026-0864 escalated to Critical
Customer complaint: dimensional out-of-spec on batch #4410. Quality review in progress.
38 min ago High
7 calibration certificates expiring within 14 days
Schedule recalibration to maintain compliance. See Maintenance > Calibration.
1h ago Medium
Warehouse stock below reorder point for 3 SKUs
BRG-4420, FLT-2290, LUB-0885 — procurement notified.
2h ago Low

OEE Trend — Last 7 Days

Actual
Target (85%)
100% 90% 80% 70% Mon Tue Wed Thu Fri Sat Sun 82% 84% 83% 85% 87% 86% 88%
First Pass Yield
0
+0.4% vs last month
Open NCRs
0
+3 since last week
Open CAPAs
0
-2 vs last month
Complaints / MU
0
-0.3 vs target

Recent Non-Conformance Reports

Recent non-conformance reports with severity and status
NCR # Date Description Line Severity Status Owner
NCR-2026-0864 06 Mar Dimensional out-of-spec, batch #4410 B Critical Open S. van der Merwe
NCR-2026-0863 05 Mar Surface finish defect on housing part C Major In Progress J. Odhiambo
NCR-2026-0862 04 Mar Contamination found in raw material A Major Open T. Naidoo
NCR-2026-0861 03 Mar Labelling error on finished goods E Minor Closed L. Pretorius
NCR-2026-0860 02 Mar Weld integrity failure on bracket D Critical In Progress M. Khumalo

Daily Pass Rate

100 98 96 94 Mon Tue Wed Thu Fri Sat

Top Defects This Month

24
Dim.
18
Surface
12
Weld
7
Label
4
Other
Lines Running
0/22
82% utilisation
Shift Output
0
+12K vs target
Scrap Rate
0
+0.3% vs target
Avg Speed (pcs/hr)
0
+2.4% this shift

Production Lines

Production lines showing status, OEE, speed, output, and scrap rate
Line Product Status OEE Speed Output Scrap
Line A Housing Assembly P-200 Running 88% 2,140 64,200 1.8%
Line B Bracket Sub-Assy K-40 Running 85% 1,860 55,800 2.2%
Line C Shaft Machining S-110 Running 82% 1,540 46,200 2.6%
Line D Gear Assembly G-80 Down -- -- 38,100 1.9%
Line E Cover Plate CP-55 Idle -- -- 22,500 3.1%
Open Work Orders
0
+5 since Monday
PM Compliance
0
+3% this month
MTTR
0h
-0.8h vs last month
Overdue Calibrations
0
Action required

Recent Work Orders

Recent maintenance work orders with priority and status
WO # Type Equipment Description Priority Status Assigned
WO-4521 Corrective LINE-D-BRG Bearing replacement — main drive Critical In Progress K. Mokoena
WO-4520 Preventive CNC-A3 Scheduled PM — spindle lubrication Normal Scheduled D. Swanepoel
WO-4519 Corrective CONV-B2 Belt alignment and tensioning High Open P. Njoroge
WO-4518 Preventive HYD-C1 Hydraulic fluid analysis and top-up Normal Complete J. Steyn
WO-4517 Inspection PRESS-E1 Annual safety inspection — press guard High Overdue T. Achieng

Work Orders by Type

23 Total Open
Corrective (48%)
Preventive (35%)
Inspection (17%)

Equipment Availability

96%
CNC
91%
Press
88%
Conv.
72%
Weld
94%
Hyd.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

Coming in Full Demo

This module is fully functional in the live platform. Request a full demo to see it in action.

This is a demonstration of The Company Floor operations platform. Learn More